Navy Virginia (SSN-774) Class Attack Submarine Procurement: Background and Issues for Congress

The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines (SSNs) since FY1998. Fourteen have been procured through FY2011, and another two are requested for FY2012. The eight boats to be procured in the five-year period FY2009-FY2013 (boats 11 through 18, in annual quantities of 1-1-2-2-2) are being procured under a multiyear procurement (MYP) arrangement. The Navy's proposed FY2012 budget requests $3,232.2 million in procurement funding to complete the procurement cost of the 15th and 16th Virginia-class boats.

Navy SSBN(X) Ballistic Missile Submarine Program: Background and Issues for Congress

Ballistic missile submarines (SSBNs) carry submarine-launched ballistic missiles (SLBMs), which are large, long-range missiles armed with multiple nuclear warheads. The SSBNs' basic mission is to remain hidden at sea with their SLBMs, so as to deter a nuclear attack on the United States by another country. Navy SSBNs form one leg of the U.S. strategic nuclear deterrent force, or "triad," which also includes land-based intercontinental ballistic missiles (ICBMs) and land-based long-range bombers.

Conventional Prompt Global Strike and Long-Range Ballistic Missiles: Background and Issues

Prompt global strike (PGS) would allow the United States to strike targets anywhere on earth with conventional weapons in as little as an hour. This capability may bolster U.S. efforts to deter and defeat adversaries by allowing the United States to attack high-value targets or "fleeting targets" at the start of or during a conflict. Congress has generally supported the PGS mission, but it has restricted funding and suggested some changes in funding for specific programs.

Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

The Navy's FY2011-FY2015 shipbuilding plan calls for procuring an 11th and final San Antonio (LPD-17) class amphibious ship in FY2012. The Navy estimates the procurement cost of this ship at $2,040.6 million. The ship received $184.0 million in FY2010 advance procurement funding, and the Navy plans to request the remaining $1,856.6 million of the ship's procurement cost in the FY2012 budget. Accordingly, the Navy's proposed FY2011 budget does not request any procurement or advance procurement funding for the LPD-17 program.

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

CVN-78, CVN-79, and CVN-80 are the first three ships in the Navy's new Gerald R. Ford (CVN-78) class of nuclear-powered aircraft carriers (CVNs). CVN-78 was procured in FY2008 and is being funded with congressionally authorized four-year incremental funding in FY2008-FY2011. The Navy's proposed FY2012 budget estimates the ship's procurement cost at $11,531.0 million (i.e., about $11.5 billion) in then-year dollars. The Navy's proposed FY2011 budget requested $1,731.3 million in procurement funding as the final increment to complete this estimated procurement cost.

Navy CG(X) Cruiser Program: Background for Congress

The Navy's FY2011 budget proposes canceling the CG(X) program as unaffordable and instead building an improved version of the Arleigh Burke (DDG-51) class Aegis destroyer called the Flight III version. This report provides background information on the CG(X) program as it existed prior to its proposed cancellation. For further discussion of the proposal to build Flight III DDG-51s in lieu of CG(X)s, see CRS Report RL32109, Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress.

Navy Ship Names: Background for Congress

Names for Navy ships traditionally have been chosen and announced by the Secretary of the Navy, under the direction of the President and in accordance with rules prescribed by Congress. Rules for giving certain types of names to certain types of Navy ships have evolved over time. There have been exceptions to the Navy's ship-naming rules, particularly for the purpose of naming a ship for a person when the rule for that type of ship would have called for it to be named for something else.

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

The Navy's proposed FY2010 budget, submitted in May 2009, originally requested funding for eight new Navy ships. This total included two relatively expensive, high-capability combatant ships (a Virginia-class attack submarine and a DDG-51 class Aegis destroyer) and six relatively inexpensive ships (three Littoral Combat Ships [LCSs], two TAKE-1 auxiliary dry cargo ships, and one Joint High Speed Vessel [JHSV]).

Navy Aegis Ballistic Missile Defense (BMD) Program: Background and Issues for Congress

The Aegis ballistic missile defense (BMD) program, which is carried out by the Missile Defense Agency (MDA) and the Navy, gives Navy Aegis cruisers and destroyers a capability for conducting BMD operations. Under current MDA and Navy plans, the number of BMD-capable Navy Aegis ships is scheduled to grow from 20 at the end of FY2010 to 38 at the end of FY2015. MDA and Navy plans also call for an increasing portion of the Navy's BMD-capable Aegis ships to be equipped with newer and more capable versions of the Aegis BMD system.

Navy Littoral Combat Ship (LCS) Program: Background, Issues, and Options for Congress

The Littoral Combat Ship (LCS) is a relatively inexpensive Navy surface combatant equipped with modular "plug-and-fight" mission packages. The Navy wants to field a force of 55 LCSs. The first two LCSs (LCS-1 and LCS-2) were procured in FY2005 and FY2006 and were commissioned into service on November 8, 2008, and January 16, 2010. Another two (LCS-3 and LCS-4) were procured in FY2009 and are under construction. Two more (LCS-5 and LCS-6) were procured in FY2010 and are under contract. The Navy's proposed FY2011 budget requested funding to procure an additional two (LCS-7 and LCS-8).